OEM & ODM laboratory furniture from China

We manufacture under your brand, to your drawings, or from our own proven designs. Either way you deal with the factory — not a trading company.

Two ways to work with us

OEM or ODM — pick the one that fits your project

Both routes come out of the same factory floor. The difference is who owns the design and how much engineering you have to do before production starts.

OEM — Original Equipment Manufacturing

You design, we build

Best when you already have a product, a spec or a drawing set you sell under your own name.

  • Production from your CAD drawings, samples or spec sheet
  • Tolerances, materials and finishes held to your document
  • Your logo, label, manual and packaging
  • No LabKern branding anywhere on the product or the carton
  • NDA signed before drawings are shared
ODM — Original Design Manufacturing

Our design, your brand

Best when you want to add a range quickly without paying for a full engineering cycle.

  • Our standard bench, hood and cabinet platforms
  • Adapt width, height, colour, worktop and fittings
  • Private-label plates, manuals and cartons
  • Faster first shipment, lower tooling cost
  • Option to move to full OEM once volumes grow
Which is cheaper for you?Below roughly one container of a single product, ODM is almost always faster. Above roughly one container, the extra engineering in OEM drawings usually pays for itself. Send your quantity and we will say which one makes sense.
Ask Which Fits
Comparison

Side by side

What it coversOEMODM
Design ownershipYours. You send the drawings, we build to them.Ours, with your brand on it. You pick from a platform that already exists.
What you send usDrawings, samples or a full written spec.A photo, a size list or a reference product.
Engineering time2 to 4 weeks of drawing rounds.Days, because the platform already exists.
Tooling / set-upMay carry a one-off charge for special profiles.Normally none.
BrandingFully neutral, or your logo, label and manual.Fully neutral, or your logo, label and manual.
Minimum orderDepends on the range and the finish. Send your quantity and we confirm in writing.Lower, because no new tooling is needed. Confirm with us per range.
Lead timeTypically 25 to 40 days after drawing approval.Typically 25 to 40 days after order confirmation.
Best forA product you already design and sell under your own name.A range you want to test in your market before committing to drawings.
What you get

Everything needed to sell it on your side

Most problems in an overseas order happen in the gap between the drawing, the carton and the site. We close that gap with documents.

Why a factory in China

The Pearl River Delta — where the parts come from

Our factory sits inside the Pearl River Delta supply chain: stainless steel coil, phenolic board, PP sheet, blowers, hinges, drawer runners and powder coating are all produced within a short drive. That is why a change of worktop or a rush replacement part does not cost you a month.

It is also why we have lasted 22 years in this trade. When one supplier slips, the next one is a short drive away.

  • Own factory, not a trading office
  • FOB Shenzhen or Guangzhou
  • English-speaking engineering contact
  • Export documents handled in-house
Packed laboratory furniture ready for export in Guangzhou, China
Questions

What buyers usually ask first

Will you sign an NDA before we send drawings?

Yes. Send us your NDA or use ours, signed before any drawing is shared. We do not show client drawings or products to other customers.

Can we order a sample before a full container?

Yes, for most standard items we can build one unit as a sample. The sample cost is quoted separately and is normally not credited against the bulk order, because the set-up cost is real.

What is the minimum order quantity?

It depends on the product and the finish — a standard bench in a stock colour is a much smaller commitment than a custom hood in a special RAL. Send your list and we will confirm the MOQ in the quotation rather than quote a number here.

Who handles shipping and customs?

We quote FOB by default and can quote CIF if you prefer. Our forwarder or yours — either is fine. Documents are issued in-house: invoice, packing list, certificate of origin and bill of lading.

Can you install on site?

We can send a supervisor for the installation period, or supply drawings and a video walkthrough for your own team. For repeat customers, we usually train your fitters on the first project and then ship with drawings only.

Related

Other ranges and next steps

Send a drawing, get a real answer

Tell us the product, the quantity and the destination port. You will get a price, a lead time and a list of what we still need from you.

Request a Quote
WhatsApp